Here are the pictures of our construction at Saddlebrooke, Az.

The pictures are in chronological order, and are loosely related to the descriptions.  (come and see for yourself)   This page will be updated approximately every Sunday - or when something happens.
Final update: 5/13/02  ----

Note: there are no auxiliary navigation aids: use 'Back".



Existing, Mar 14,2001 "The Plan" The floor plan Breaking ground
Dirt Trenches Sewer trench - 8' deep  Forms -1
Hail delay Forms -2 Forms -3 Concrete day
The Pump Holy S--t!! Ready -- Pour concrete
Concrete 22 yds -- not enough Concrete -2 Concrete -3
Concrete done Concrete done -2 Framing; day 1 Framing -2
1st wall 1st wall -2 Framing -3 Framing -4
End wall Framing -5 House wall Day 1 result
Demolition Demolition -2 Falling wall Dead wall
Day 2 result Framing; day 2a New dining room -sorta Front arch
Rear arch  Day 2a result  Framing day 3  Dead trusses ?
 Trusses  Trusses -2  Trusses -3  Trusses -4
 Trusses -5  Roof sheathing  Tina's view (so far)  Day 3 result
 Framing Day 4  Used Truck Sale  Demolition 3  Inside 1
 Inside 2  Inside 3  Dome -inside  Roofing
 Roofing 2  Roofing 3  Framing done  Framing Done 2
 Framing done 3  Framing Done 4  Ready for roof tile  Loading tile
 Tile stacked  Stairs  Stairs 2  Stairs 3
 Atrium windows  Atrium inside  Dining room windows  Dining inside
 New door  Sheetrock delivery  A/C install  Ready for stucco
 Ready for stucco 2  Stucco  Stucco 2  Stucco 3
 Stucco done 1  Stucco done 2  Stucco done 3  Stucco done 4
 Stucco done 5  Sheetrock install 1  Insulation  Electrical
 Painting  Painting 2  Unexpected visitor --  -- heads for high ground
 Outside painted 1  Outside painted 2  Outside painted 3  Outside painted 4
 Sheetrock install 2  Sheetrock install 3  Sheetrock install 4  Sheetrock install 5
 Sheetrock install 6  Sheetrock install 7  Sheetrock finish 1  Sheetrock finish 2
 Roof done 1  Roof done 2  Roof done 3  Roof done 4
 First steel  Stairs inside  New door finished Platform support 1
Platform support 2 Platform support 3 Platform support 4  Block wall detail
 Grate install  First grate  New door installed  Stairs & door
 View area 1  View area 2  Compare to 'plan'  New side entry
 View from platform  Dining area 1  Dining area 2  Front patio
 Rear Patio  New cabinets  Drainage  Front landscape
 Enclosed patio  Shade screens  South view  Southwest view
 Floor installation  Floor done   Front entry  Side entry
 Pool table move  Living room  Recreation room  Pool table
 Dining room  Studio - sewing room  Studio - office  Studio - kitchenette
 Beginning landscape  Finished  Finished  Finished
 Finished


Status:
6/3: Windows already 3 weeks late, now order canceled due to apparent retailer bankruptcy.   Have to re-order.
6/23: Finally some progress. Picked up stairs in Houston 6/15. Windows arrive 6/18-6/23. New door delivered 6/21.
7/14: Looking like a house.  Way more to do, though.
8/19: Some landscaping, some inside work (and more), and this is done.
9/24: Pretty much done outside.
11/1: In danger of stalling in the details.
5/3/02: Done, and moved in months ago.

(For those who think I'll never learn about construction projects,  -- get a hobby or something.)



Comments, Questions?                                   Complaints



Copyright 1999-2004, Idle Hands Design